{"id":274,"date":"2026-03-31T02:10:29","date_gmt":"2026-03-31T02:10:29","guid":{"rendered":"https:\/\/ethos-pmgroup.com\/?p=274"},"modified":"2026-04-12T02:46:06","modified_gmt":"2026-04-12T02:46:06","slug":"nyc-local-law-11-fisp-requirements-deadlines-costs-strategic-planning-guide","status":"publish","type":"post","link":"https:\/\/ethos-pmgroup.com\/?p=274","title":{"rendered":"NYC Local Law 11 (FISP): Requirements, Deadlines, Costs and Strategic Planning Guide"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Introduction<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For co-op and condominium boards in New York City, NYC Local Law 11 is not simply a regulatory requirement \u2014 it is a <strong>capital risk event<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While often treated as a periodic inspection, Local Law 11 (also known as the Facade Inspection Safety Program, or FISP) directly impacts:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>building safety<\/li>\n\n\n\n<li>capital planning<\/li>\n\n\n\n<li>long-term asset value<\/li>\n\n\n\n<li>financial exposure<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">With <strong>FISP Cycle 10 currently underway<\/strong>, boards that approach compliance reactively often face:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>accelerated repair costs<\/li>\n\n\n\n<li>loss of contractor leverage<\/li>\n\n\n\n<li>avoidable change orders<\/li>\n\n\n\n<li>extended sidewalk shed duration<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Structured planning \u2014 before deadlines \u2014 is what separates controlled projects from costly ones.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Is NYC Local Law 11 (FISP)?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Local Law 11 requires buildings <strong>greater than six stories<\/strong> to undergo fa\u00e7ade inspections every five years.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These inspections must be performed by a:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Qualified Exterior Wall Inspector (QEWI)<\/strong><\/li>\n\n\n\n<li>licensed professional engineer or registered architect<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The purpose is straightforward:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Prevent fa\u00e7ade deterioration that could result in falling debris and public safety hazards.<\/p>\n<\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\">Which Buildings Must Comply?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Local Law 11 applies to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Buildings taller than 6 stories<\/li>\n\n\n\n<li>Residential, commercial, and mixed-use properties<\/li>\n\n\n\n<li>All five boroughs of New York City<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Failure to comply exposes the building to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>financial penalties<\/li>\n\n\n\n<li>violations<\/li>\n\n\n\n<li>liability exposure<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">FISP Cycle 10 Deadlines<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">FISP inspections are divided into staggered sub-cycles:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Sub-Cycle<\/th><th>Building Ending Digit<\/th><th>Filing Deadline<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>1, 4, 7<\/td><td>Feb 21, 2025<\/td><\/tr><tr><td>B<\/td><td>2, 5, 8<\/td><td>Feb 21, 2026<\/td><\/tr><tr><td>C<\/td><td>3, 6, 9<\/td><td>Feb 21, 2027<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Missing these deadlines results in:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>$1,000\/month penalties<\/strong><\/li>\n\n\n\n<li>potential escalation to enforcement actions<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Inspection Classifications: SAFE vs SWARMP vs UNSAFE<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">After inspection, buildings are classified into one of three categories:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">SAFE<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>No repairs required<\/li>\n\n\n\n<li>No immediate risk<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">SWARMP (Safe With a Repair and Maintenance Program)<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Conditions exist but are not immediately hazardous<\/li>\n\n\n\n<li>Repairs must be completed within a defined timeframe<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Note:<\/strong><br>This is where most boards underestimate risk \u2014 SWARMP conditions often evolve into significantly more expensive repairs if deferred.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">UNSAFE<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Immediate hazard to public safety<\/li>\n\n\n\n<li>Requires:\n<ul class=\"wp-block-list\">\n<li>sidewalk shed installation<\/li>\n\n\n\n<li>emergency repairs<\/li>\n\n\n\n<li>immediate DOB notification<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">The Real Cost of Local Law 11 Projects<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Typical cost ranges:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Engineering inspections: <strong>$5,000 \u2013 $15,000<\/strong><\/li>\n\n\n\n<li>Sidewalk sheds: <strong>$20,000 \u2013 $100,000+<\/strong><\/li>\n\n\n\n<li>Fa\u00e7ade repairs: <strong>$50,000 \u2013 $1M+<\/strong><\/li>\n<\/ul>\n\n\n\n<p>\nMany of these cost pressures are now compounded by emissions regulations under \n<a href=\"\/?p=293\" class=\"text-ethos-navy underline hover:text-ethos-gold\">\nNYC Local Law 97\n<\/a>, where delayed capital planning can result in both construction cost escalation and recurring financial penalties.\n<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, the <strong>true cost driver is not the work itself<\/strong> \u2014 it is:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Lack of early-stage control<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For a detailed breakdown of pricing and cost drivers, see our <a href=\"https:\/\/ethos-pmgroup.com\/?p=315\" type=\"link\" id=\"https:\/\/ethos-pmgroup.com\/?p=315\">NYC facade repair cost guide<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cost escalation typically results from:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>incomplete scope definition<\/li>\n\n\n\n<li>delayed inspections<\/li>\n\n\n\n<li>reactive contractor procurement<\/li>\n\n\n\n<li>emergency repair conditions<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Where Local Law 11 Projects Typically Go Wrong<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Most cost overruns are not caused in construction \u2014 they originate earlier.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Delayed Planning<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Waiting until filing deadlines compresses:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>contractor availability<\/li>\n\n\n\n<li>pricing leverage<\/li>\n\n\n\n<li>scheduling flexibility<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">2. Incomplete Engineering Scope<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Insufficient investigation leads to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>change orders<\/li>\n\n\n\n<li>scope expansion mid-project<\/li>\n\n\n\n<li>contractor disputes<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">3. Reactive Contractor Selection<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Late bidding environments reduce competition and increase pricing volatility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Selecting the right contractor is critical to maintaining cost and schedule control. See our guide on <a href=\"https:\/\/ethos-pmgroup.com\/?p=340\">how to evaluate a contractor<\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Prolonged Sidewalk Shed Duration<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Extended projects increase:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>carrying costs<\/li>\n\n\n\n<li>tenant dissatisfaction<\/li>\n\n\n\n<li>operational impact<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Extended shed durations are a major cost driver. Learn more about installation costs and timelines in our <a href=\"https:\/\/ethos-pmgroup.com\/?p=344\">sidewalk shed cost guide<\/a> <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Strategic Approach: Controlling Cost &amp; Risk<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Boards that manage Local Law 11 effectively follow a structured approach:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Early Inspection &amp; Assessment<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Engage QEWI before deadline pressure<\/li>\n\n\n\n<li>Identify full scope early<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Defined Project Scope<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ensure engineering documentation is complete<\/li>\n\n\n\n<li>Reduce ambiguity before bidding<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Competitive Procurement<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Solicit multiple qualified contractors<\/li>\n\n\n\n<li>Compare <strong>aligned scopes<\/strong>, not just price<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Independent Project Oversight<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Monitor cost, schedule, and contractor performance<\/li>\n\n\n\n<li>Control change orders before they occur<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Why Project Management Matters<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Local Law 11 projects require coordination between:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>engineers<\/li>\n\n\n\n<li>contractors<\/li>\n\n\n\n<li>property managers<\/li>\n\n\n\n<li>regulatory agencies<\/li>\n\n\n\n<li>residents<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Without structured oversight, boards often face:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>fragmented communication<\/li>\n\n\n\n<li>cost overruns<\/li>\n\n\n\n<li>timeline delays<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Independent project management provides:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>cost control<\/li>\n\n\n\n<li>schedule discipline<\/li>\n\n\n\n<li>risk mitigation<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion: Local Law 11 Is a Financial Decision<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Local Law 11 is often viewed as compliance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In reality, it is a <strong>capital planning event that directly impacts asset value<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Boards that act early:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>reduce costs<\/li>\n\n\n\n<li>maintain control<\/li>\n\n\n\n<li>avoid reactive decisions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Boards that delay:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>inherit higher costs<\/li>\n\n\n\n<li>face compressed timelines<\/li>\n\n\n\n<li>lose leverage<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Planning Your FISP Project<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">If your building is approaching a Local Law 11 filing deadline, early planning can significantly reduce cost exposure and prevent avoidable risk.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ethos Project Management Group provides independent oversight for fa\u00e7ade and capital projects \u2014 helping boards maintain control of scope, cost, and execution.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction For co-op and condominium boards in New York City, NYC Local Law 11 is not simply a regulatory requirement \u2014 it is a capital risk event. While often treated as a periodic inspection, Local Law 11 (also known as the Facade Inspection Safety Program, or FISP) directly impacts: With FISP Cycle 10 currently underway, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_wpcom_ai_launchpad_first_post":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[8],"tags":[15,14,17,11,12,13,16,18,10,19],"class_list":["post-274","post","type-post","status-publish","format-standard","hentry","category-regulatory-compliance","tag-building-facade-repair","tag-facade-inspection-nyc","tag-facade-safety-program","tag-fisp","tag-local-law-11","tag-nyc-building-compliance","tag-nyc-construction-regulations","tag-nyc-facade-inspection","tag-qewi-inspection","tag-sidewalk-shed-nyc"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>NYC Local Law 11 (FISP): Requirements, Deadlines, Costs and Strategic Planning Guide - Ethos PM Group<\/title>\n<meta name=\"description\" content=\"Avoid costly overruns. Learn NYC Local Law 11 deadlines, SWARMP risks, and a strategic approach to FISP compliance to protect asset value.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ethos-pmgroup.com\/?p=274\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NYC Local Law 11 (FISP): Requirements, Deadlines, Costs and Strategic Planning Guide - Ethos PM Group\" \/>\n<meta property=\"og:description\" content=\"Avoid costly overruns. Learn NYC Local Law 11 deadlines, SWARMP risks, and a strategic approach to FISP compliance to protect asset value.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ethos-pmgroup.com\/?p=274\" \/>\n<meta property=\"og:site_name\" content=\"Ethos PM Group\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-31T02:10:29+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-12T02:46:06+00:00\" \/>\n<meta name=\"author\" content=\"svanius\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"svanius\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=274#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=274\"},\"author\":{\"name\":\"svanius\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#\\\/schema\\\/person\\\/ea8d30ba326f3681f5096c25caac6c01\"},\"headline\":\"NYC Local Law 11 (FISP): Requirements, Deadlines, Costs and Strategic Planning Guide\",\"datePublished\":\"2026-03-31T02:10:29+00:00\",\"dateModified\":\"2026-04-12T02:46:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=274\"},\"wordCount\":724,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#organization\"},\"keywords\":[\"Building facade repair\",\"Facade inspection NYC\",\"Facade safety program\",\"FISP\",\"Local Law 11\",\"NYC building compliance\",\"NYC construction regulations\",\"NYC facade inspection\",\"QEWI inspection\",\"Sidewalk shed NYC\"],\"articleSection\":[\"Regulatory Compliance\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=274#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=274\",\"url\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=274\",\"name\":\"NYC Local Law 11 (FISP): Requirements, Deadlines, Costs and Strategic Planning Guide - Ethos PM Group\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#website\"},\"datePublished\":\"2026-03-31T02:10:29+00:00\",\"dateModified\":\"2026-04-12T02:46:06+00:00\",\"description\":\"Avoid costly overruns. Learn NYC Local Law 11 deadlines, SWARMP risks, and a strategic approach to FISP compliance to protect asset value.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=274#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=274\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=274#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ethos-pmgroup.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"NYC Local Law 11 (FISP): Requirements, Deadlines, Costs and Strategic Planning Guide\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#website\",\"url\":\"https:\\\/\\\/ethos-pmgroup.com\\\/\",\"name\":\"Ethos PM Group\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#organization\",\"name\":\"Ethos PM Group\",\"url\":\"https:\\\/\\\/ethos-pmgroup.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ethos-pmgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Ethos-PM-Logo.png\",\"contentUrl\":\"https:\\\/\\\/ethos-pmgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Ethos-PM-Logo.png\",\"width\":2048,\"height\":2048,\"caption\":\"Ethos PM Group\"},\"image\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#\\\/schema\\\/person\\\/ea8d30ba326f3681f5096c25caac6c01\",\"name\":\"svanius\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89d5a07878736b82395d1ed72dd4e1ca9e7b3fc09fe6509c4199ac4136214b5b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89d5a07878736b82395d1ed72dd4e1ca9e7b3fc09fe6509c4199ac4136214b5b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89d5a07878736b82395d1ed72dd4e1ca9e7b3fc09fe6509c4199ac4136214b5b?s=96&d=mm&r=g\",\"caption\":\"svanius\"},\"sameAs\":[\"https:\\\/\\\/ethos-pmgroup.com\"],\"url\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?author=1\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"NYC Local Law 11 (FISP): Requirements, Deadlines, Costs and Strategic Planning Guide - Ethos PM Group","description":"Avoid costly overruns. Learn NYC Local Law 11 deadlines, SWARMP risks, and a strategic approach to FISP compliance to protect asset value.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ethos-pmgroup.com\/?p=274","og_locale":"en_US","og_type":"article","og_title":"NYC Local Law 11 (FISP): Requirements, Deadlines, Costs and Strategic Planning Guide - Ethos PM Group","og_description":"Avoid costly overruns. Learn NYC Local Law 11 deadlines, SWARMP risks, and a strategic approach to FISP compliance to protect asset value.","og_url":"https:\/\/ethos-pmgroup.com\/?p=274","og_site_name":"Ethos PM Group","article_published_time":"2026-03-31T02:10:29+00:00","article_modified_time":"2026-04-12T02:46:06+00:00","author":"svanius","twitter_card":"summary_large_image","twitter_misc":{"Written by":"svanius","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ethos-pmgroup.com\/?p=274#article","isPartOf":{"@id":"https:\/\/ethos-pmgroup.com\/?p=274"},"author":{"name":"svanius","@id":"https:\/\/ethos-pmgroup.com\/#\/schema\/person\/ea8d30ba326f3681f5096c25caac6c01"},"headline":"NYC Local Law 11 (FISP): Requirements, Deadlines, Costs and Strategic Planning Guide","datePublished":"2026-03-31T02:10:29+00:00","dateModified":"2026-04-12T02:46:06+00:00","mainEntityOfPage":{"@id":"https:\/\/ethos-pmgroup.com\/?p=274"},"wordCount":724,"commentCount":0,"publisher":{"@id":"https:\/\/ethos-pmgroup.com\/#organization"},"keywords":["Building facade repair","Facade inspection NYC","Facade safety program","FISP","Local Law 11","NYC building compliance","NYC construction regulations","NYC facade inspection","QEWI inspection","Sidewalk shed NYC"],"articleSection":["Regulatory Compliance"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/ethos-pmgroup.com\/?p=274#respond"]}]},{"@type":"WebPage","@id":"https:\/\/ethos-pmgroup.com\/?p=274","url":"https:\/\/ethos-pmgroup.com\/?p=274","name":"NYC Local Law 11 (FISP): Requirements, Deadlines, Costs and Strategic Planning Guide - Ethos PM Group","isPartOf":{"@id":"https:\/\/ethos-pmgroup.com\/#website"},"datePublished":"2026-03-31T02:10:29+00:00","dateModified":"2026-04-12T02:46:06+00:00","description":"Avoid costly overruns. Learn NYC Local Law 11 deadlines, SWARMP risks, and a strategic approach to FISP compliance to protect asset value.","breadcrumb":{"@id":"https:\/\/ethos-pmgroup.com\/?p=274#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ethos-pmgroup.com\/?p=274"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/ethos-pmgroup.com\/?p=274#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ethos-pmgroup.com\/"},{"@type":"ListItem","position":2,"name":"NYC Local Law 11 (FISP): Requirements, Deadlines, Costs and Strategic Planning Guide"}]},{"@type":"WebSite","@id":"https:\/\/ethos-pmgroup.com\/#website","url":"https:\/\/ethos-pmgroup.com\/","name":"Ethos PM Group","description":"","publisher":{"@id":"https:\/\/ethos-pmgroup.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ethos-pmgroup.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ethos-pmgroup.com\/#organization","name":"Ethos PM Group","url":"https:\/\/ethos-pmgroup.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ethos-pmgroup.com\/#\/schema\/logo\/image\/","url":"https:\/\/ethos-pmgroup.com\/wp-content\/uploads\/2026\/03\/Ethos-PM-Logo.png","contentUrl":"https:\/\/ethos-pmgroup.com\/wp-content\/uploads\/2026\/03\/Ethos-PM-Logo.png","width":2048,"height":2048,"caption":"Ethos PM Group"},"image":{"@id":"https:\/\/ethos-pmgroup.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/ethos-pmgroup.com\/#\/schema\/person\/ea8d30ba326f3681f5096c25caac6c01","name":"svanius","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/89d5a07878736b82395d1ed72dd4e1ca9e7b3fc09fe6509c4199ac4136214b5b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/89d5a07878736b82395d1ed72dd4e1ca9e7b3fc09fe6509c4199ac4136214b5b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/89d5a07878736b82395d1ed72dd4e1ca9e7b3fc09fe6509c4199ac4136214b5b?s=96&d=mm&r=g","caption":"svanius"},"sameAs":["https:\/\/ethos-pmgroup.com"],"url":"https:\/\/ethos-pmgroup.com\/?author=1"}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/274","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=274"}],"version-history":[{"count":12,"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/274\/revisions"}],"predecessor-version":[{"id":365,"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/274\/revisions\/365"}],"wp:attachment":[{"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=274"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}