{"id":360,"date":"2026-04-12T02:33:17","date_gmt":"2026-04-12T02:33:17","guid":{"rendered":"https:\/\/ethos-pmgroup.com\/?p=360"},"modified":"2026-04-12T02:33:43","modified_gmt":"2026-04-12T02:33:43","slug":"capital-project-mistakes-nyc","status":"publish","type":"post","link":"https:\/\/ethos-pmgroup.com\/?p=360","title":{"rendered":"5 Costly Mistakes NYC Boards Make During Capital Projects"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Introduction<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Capital projects in New York City buildings are complex, high-cost undertakings that require coordination across multiple stakeholders.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While technical challenges are often anticipated, most project failures are not caused by construction issues. Instead, they stem from early-stage decisions, misalignment, and lack of structured oversight.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Projects tied to requirements such as <a href=\"https:\/\/ethos-pmgroup.com\/?p=274\" type=\"link\" id=\"https:\/\/ethos-pmgroup.com\/?p=274\">NYC Local Law 11<\/a> or emissions compliance frequently amplify these risks due to regulatory pressure and fixed timelines.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Understanding the most common mistakes allows boards and owners to avoid unnecessary cost, delays, and operational disruption.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">1. Delaying Planning Until Deadlines Approach<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">One of the most common issues is waiting too long to begin the process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This often results in:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>limited contractor availability<\/li>\n\n\n\n<li>higher pricing<\/li>\n\n\n\n<li>compressed decision-making timelines<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For example, fa\u00e7ade work required under <a href=\"https:\/\/ethos-pmgroup.com\/?p=274\">Local Law 11<\/a> follows predictable cycles. Despite this, many buildings initiate projects only when deadlines are near.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Early planning improves flexibility and cost control.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">2. Incomplete Scope Definition<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Projects that begin without fully developed drawings and specifications often experience:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>inconsistent contractor bids<\/li>\n\n\n\n<li>scope gaps<\/li>\n\n\n\n<li>increased change orders<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Incomplete documentation shifts risk from the planning phase to construction, where corrections are more expensive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For a breakdown of how scope impacts cost, see:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/ethos-pmgroup.com\/?p=315\" type=\"link\" id=\"https:\/\/ethos-pmgroup.com\/?p=315\">NYC Facade Repair Cost Guide: Local Law 11 Pricing, Factors and Budget Planning<\/a><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">3. Selecting Contractors Based Solely on Price<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Choosing the lowest bid without evaluating scope and capability is a significant risk.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lower bids may reflect:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>omitted work<\/li>\n\n\n\n<li>unrealistic assumptions<\/li>\n\n\n\n<li>pricing strategies designed to recover costs later<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A structured evaluation process is essential.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For guidance, see:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/ethos-pmgroup.com\/?p=340\">How to Evaluate a Contractor Beyond the Lowest Bid (NYC Capital Projects Guide)<\/a><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">4. Lack of Coordinated Oversight<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Capital projects require coordination between:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>engineers<\/li>\n\n\n\n<li>contractors<\/li>\n\n\n\n<li>property management<\/li>\n\n\n\n<li>board representatives<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Without clear oversight, projects often experience:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>communication gaps<\/li>\n\n\n\n<li>delays in decision-making<\/li>\n\n\n\n<li>misalignment between scope and execution<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This often leads to extended timelines and increased costs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">5. Reactive Financial Planning<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Many projects are funded reactively rather than strategically.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This results in:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>special assessments<\/li>\n\n\n\n<li>financial strain on residents<\/li>\n\n\n\n<li>limited ability to phase work<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A structured capital planning approach allows boards to anticipate costs and reduce financial disruption.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For more detail, see:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>How NYC Boards Can Plan Capital Projects Without Special Assessments<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">The Common Thread<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">These mistakes are interconnected.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Delays in planning lead to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>rushed procurement<\/li>\n\n\n\n<li>incomplete scope<\/li>\n\n\n\n<li>poor contractor selection<\/li>\n\n\n\n<li>extended timelines<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The result is a compounding effect on cost and risk.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Strategic Approach to Avoiding These Mistakes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Boards that successfully manage capital projects focus on:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>early planning<\/li>\n\n\n\n<li>complete documentation<\/li>\n\n\n\n<li>structured procurement<\/li>\n\n\n\n<li>coordinated oversight<\/li>\n\n\n\n<li>integrated financial strategy<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Capital project challenges are rarely the result of a single issue. They are typically the outcome of multiple early-stage decisions that compound over time.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Boards and owners that approach projects with structure and discipline can significantly reduce risk, maintain cost control, and improve overall outcomes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Planning Your Next Project<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">If your building is preparing for a capital project or evaluating upcoming work, a structured approach can help avoid common pitfalls and improve long-term performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ethos Project Management Group provides advisory and oversight services to support capital projects from planning through completion.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction Capital projects in New York City buildings are complex, high-cost undertakings that require coordination across multiple stakeholders. While technical challenges are often anticipated, most project failures are not caused by construction issues. Instead, they stem from early-stage decisions, misalignment, and lack of structured oversight. Projects tied to requirements such as NYC Local Law 11 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_wpcom_ai_launchpad_first_post":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[7],"tags":[76,53,80,77,79,78,67,81],"class_list":["post-360","post","type-post","status-publish","format-standard","hentry","category-board-governance","tag-board-governance-construction","tag-building-project-management-nyc","tag-capital-project-mistakes-nyc","tag-construction-risks-nyc","tag-contractor-selection-mistakes","tag-facade-project-risks","tag-nyc-building-maintenance","tag-project-planning-mistakes"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>5 Costly Mistakes NYC Boards Make During Capital Projects - Ethos PM Group<\/title>\n<meta name=\"description\" content=\"Discover the most common capital project mistakes NYC boards make and how to avoid costly delays, change orders, and financial risks in building projects.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ethos-pmgroup.com\/?p=360\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"5 Costly Mistakes NYC Boards Make During Capital Projects - Ethos PM Group\" \/>\n<meta property=\"og:description\" content=\"Discover the most common capital project mistakes NYC boards make and how to avoid costly delays, change orders, and financial risks in building projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ethos-pmgroup.com\/?p=360\" \/>\n<meta property=\"og:site_name\" content=\"Ethos PM Group\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-12T02:33:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-12T02:33:43+00:00\" \/>\n<meta name=\"author\" content=\"svanius\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"svanius\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=360#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=360\"},\"author\":{\"name\":\"svanius\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#\\\/schema\\\/person\\\/ea8d30ba326f3681f5096c25caac6c01\"},\"headline\":\"5 Costly Mistakes NYC Boards Make During Capital Projects\",\"datePublished\":\"2026-04-12T02:33:17+00:00\",\"dateModified\":\"2026-04-12T02:33:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=360\"},\"wordCount\":509,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#organization\"},\"keywords\":[\"board governance construction\",\"building project management NYC\",\"capital project mistakes NYC\",\"construction risks NYC\",\"contractor selection mistakes\",\"facade project risks\",\"NYC building maintenance\",\"project planning mistakes\"],\"articleSection\":[\"Board Governance\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=360#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=360\",\"url\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=360\",\"name\":\"5 Costly Mistakes NYC Boards Make During Capital Projects - Ethos PM Group\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#website\"},\"datePublished\":\"2026-04-12T02:33:17+00:00\",\"dateModified\":\"2026-04-12T02:33:43+00:00\",\"description\":\"Discover the most common capital project mistakes NYC boards make and how to avoid costly delays, change orders, and financial risks in building projects.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=360#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=360\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?p=360#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ethos-pmgroup.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"5 Costly Mistakes NYC Boards Make During Capital Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#website\",\"url\":\"https:\\\/\\\/ethos-pmgroup.com\\\/\",\"name\":\"Ethos PM Group\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#organization\",\"name\":\"Ethos PM Group\",\"url\":\"https:\\\/\\\/ethos-pmgroup.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ethos-pmgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Ethos-PM-Logo.png\",\"contentUrl\":\"https:\\\/\\\/ethos-pmgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Ethos-PM-Logo.png\",\"width\":2048,\"height\":2048,\"caption\":\"Ethos PM Group\"},\"image\":{\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ethos-pmgroup.com\\\/#\\\/schema\\\/person\\\/ea8d30ba326f3681f5096c25caac6c01\",\"name\":\"svanius\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89d5a07878736b82395d1ed72dd4e1ca9e7b3fc09fe6509c4199ac4136214b5b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89d5a07878736b82395d1ed72dd4e1ca9e7b3fc09fe6509c4199ac4136214b5b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89d5a07878736b82395d1ed72dd4e1ca9e7b3fc09fe6509c4199ac4136214b5b?s=96&d=mm&r=g\",\"caption\":\"svanius\"},\"sameAs\":[\"https:\\\/\\\/ethos-pmgroup.com\"],\"url\":\"https:\\\/\\\/ethos-pmgroup.com\\\/?author=1\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"5 Costly Mistakes NYC Boards Make During Capital Projects - Ethos PM Group","description":"Discover the most common capital project mistakes NYC boards make and how to avoid costly delays, change orders, and financial risks in building projects.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ethos-pmgroup.com\/?p=360","og_locale":"en_US","og_type":"article","og_title":"5 Costly Mistakes NYC Boards Make During Capital Projects - Ethos PM Group","og_description":"Discover the most common capital project mistakes NYC boards make and how to avoid costly delays, change orders, and financial risks in building projects.","og_url":"https:\/\/ethos-pmgroup.com\/?p=360","og_site_name":"Ethos PM Group","article_published_time":"2026-04-12T02:33:17+00:00","article_modified_time":"2026-04-12T02:33:43+00:00","author":"svanius","twitter_card":"summary_large_image","twitter_misc":{"Written by":"svanius","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ethos-pmgroup.com\/?p=360#article","isPartOf":{"@id":"https:\/\/ethos-pmgroup.com\/?p=360"},"author":{"name":"svanius","@id":"https:\/\/ethos-pmgroup.com\/#\/schema\/person\/ea8d30ba326f3681f5096c25caac6c01"},"headline":"5 Costly Mistakes NYC Boards Make During Capital Projects","datePublished":"2026-04-12T02:33:17+00:00","dateModified":"2026-04-12T02:33:43+00:00","mainEntityOfPage":{"@id":"https:\/\/ethos-pmgroup.com\/?p=360"},"wordCount":509,"commentCount":0,"publisher":{"@id":"https:\/\/ethos-pmgroup.com\/#organization"},"keywords":["board governance construction","building project management NYC","capital project mistakes NYC","construction risks NYC","contractor selection mistakes","facade project risks","NYC building maintenance","project planning mistakes"],"articleSection":["Board Governance"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/ethos-pmgroup.com\/?p=360#respond"]}]},{"@type":"WebPage","@id":"https:\/\/ethos-pmgroup.com\/?p=360","url":"https:\/\/ethos-pmgroup.com\/?p=360","name":"5 Costly Mistakes NYC Boards Make During Capital Projects - Ethos PM Group","isPartOf":{"@id":"https:\/\/ethos-pmgroup.com\/#website"},"datePublished":"2026-04-12T02:33:17+00:00","dateModified":"2026-04-12T02:33:43+00:00","description":"Discover the most common capital project mistakes NYC boards make and how to avoid costly delays, change orders, and financial risks in building projects.","breadcrumb":{"@id":"https:\/\/ethos-pmgroup.com\/?p=360#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ethos-pmgroup.com\/?p=360"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/ethos-pmgroup.com\/?p=360#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ethos-pmgroup.com\/"},{"@type":"ListItem","position":2,"name":"5 Costly Mistakes NYC Boards Make During Capital Projects"}]},{"@type":"WebSite","@id":"https:\/\/ethos-pmgroup.com\/#website","url":"https:\/\/ethos-pmgroup.com\/","name":"Ethos PM Group","description":"","publisher":{"@id":"https:\/\/ethos-pmgroup.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ethos-pmgroup.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ethos-pmgroup.com\/#organization","name":"Ethos PM Group","url":"https:\/\/ethos-pmgroup.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ethos-pmgroup.com\/#\/schema\/logo\/image\/","url":"https:\/\/ethos-pmgroup.com\/wp-content\/uploads\/2026\/03\/Ethos-PM-Logo.png","contentUrl":"https:\/\/ethos-pmgroup.com\/wp-content\/uploads\/2026\/03\/Ethos-PM-Logo.png","width":2048,"height":2048,"caption":"Ethos PM Group"},"image":{"@id":"https:\/\/ethos-pmgroup.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/ethos-pmgroup.com\/#\/schema\/person\/ea8d30ba326f3681f5096c25caac6c01","name":"svanius","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/89d5a07878736b82395d1ed72dd4e1ca9e7b3fc09fe6509c4199ac4136214b5b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/89d5a07878736b82395d1ed72dd4e1ca9e7b3fc09fe6509c4199ac4136214b5b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/89d5a07878736b82395d1ed72dd4e1ca9e7b3fc09fe6509c4199ac4136214b5b?s=96&d=mm&r=g","caption":"svanius"},"sameAs":["https:\/\/ethos-pmgroup.com"],"url":"https:\/\/ethos-pmgroup.com\/?author=1"}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/360","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=360"}],"version-history":[{"count":2,"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/360\/revisions"}],"predecessor-version":[{"id":362,"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/360\/revisions\/362"}],"wp:attachment":[{"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=360"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=360"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ethos-pmgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=360"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}